Inside the Gigafactory That Will Decide Tesla's Fate

From Bloomberg:

To get to Tesla’s Gigafactory, you drive east from Reno, Nevada, turn into a sprawling industrial center, and make a left on Electric Avenue. The high desert landscape dwarfs everything, even the vast white building with the red stripe along the top. As you reach the gate with the security guard, the breadth of Tesla’s ambitions becomes clear. Even the name itself suggests more to come: Gigafactory 1...

...The $5 billion Gigafactory was born of necessity. Tesla needs a hell of a lot of batteries, for both the forthcoming mass-market Model 3 sedan and the Tesla Energy product line. The timeline for getting those batteries made just became much shorter, too. On Wednesday, Tesla Chief Executive Elon Musk stunned investors by announcing a sped-up production schedule that calls for a half-million electric vehicles per year by 2018, not the previously stated goal of 2020. For a company that delivered just 50,658 vehicles in 2015, the ramp looks like a hockey stick... (full story)

Comments (0)

This post does not have any comments. Be the first to leave a comment below.


Post A Comment

You must be logged in before you can post a comment. Login now.

Featured Product

New M12 A-Coded Connectors from binder are now Ecolab and FDA certified

New M12 A-Coded Connectors from binder are now Ecolab and FDA certified

binder USA, LP, has expanded the M12 product family with the addition of the M12 A-Coded Connector, which is now certified for both Ecolab and FDA Code of Federal Regulations (CFR) Title 21 standards. The M12 A-Coded connectors are extraordinarily durable and IP69K-rated, ideal for harsh-duty and washdown applications in the food and beverage, pharmaceutical, and chemical industries. Available in 3, 4, 5, 8, and 12 contacts, the high quality stainless steel locking rings (V4A) and gold contact plating can also withstand UV exposure and shock and vibration.